Isolated Phase Bus Duct Maintenance and Inspections

Our Isophase Maintenance and Inspection Division provides you with your isophase or bar bus maintenance & inspections from generator to transformer.

They can handle all of the following tasks in your power plant.

  • Borescope Inspection with complete report
  • Electro-Silver Plating of all connections and ends
  • Cryogenic Cleaning of inside & outside of bus
  • Flexible Braid & Link replacement
  • Hardware & Gasket replacement
  • Welding
  • Troubleshooting

Our Capabilities

Borescope Inspection

With our state-of-the-art Borescope cameras (with 120° articulating head) we are able to capture both still photographs & video from inside your entire Isophase Bus Duct System.

With this technology we are able to detect cracks in insulators, fractures in welds, missing hardware, FME, debris, moisture buildups, etc.

Our cameras are also fitted with 30 feet of inspection cable which allows us to inspect 60’ from one cover opening.

Cryogenic Cleaning

National Conductor provides dry ice blasting/ cryogenic cleaning (Co2) for dust, debris, fire, soot and smoke damage.

We clean Isophase bus, non-seg bus, insulators, transformers, switchgear and other power generation related equipment that has most any residue.

Dust, debris, soot, and smoke damage that is left behind can cause issues with the electrical currents that run through the equipment.

In the past, the only option was to scrub the whole unit down with isopropyl alcohol, which is very time consuming. Rather than scrub down the entire unit, cryogenic cleaning/dry ice blasting can be used in its place, which in turn can significantly reduce downtime.

This process is non-conductive, which means that electronics & electrical components will not be affected by this type of cleaning.

Electro-Silver Plating

National Conductor chooses to use the “Electro-plating” method for our plating projects versus the “Cool Amp” method.

The benefits of our application are that ours is applied using “current” which fuses the metals together to form a bond and lasts much longer versus “Cool Amp”, which is applied to the surface only.

We can apply product to original manufacturer specifications or beyond, or to any desired thickness. We can do copper, nickel, and silver plating and we can also apply over aluminum & copper.

We can plate flex links, braids, LV bushings, spade ends, and all terminal connections.

We are DOT & EPA compliant and our certified technicians are trained in plating & in hazardous material handling.

We have mobile labs that we can bring to your site and perform the plating or if it is more convenient, you can also ship your products to us and we can have them plated at one of our facilities.

Featured M&I Projects

Nebraska City

Project Details

  • Location: Nebraska City, NE
  • Completion Date: 2017

NCC Performed:

  • NCC performed a Borescope Inspection of all IPB & Non-Seg bus systems.
  • Cryogenic cleaned the IPB system to remove dust, contaminates, & wipe down all support insulators.
  • Replaced Neoprene rubber boots.
  • Performed pressure testing & trouble shooting of plants pressure system.

Faribault Energy Center

Project Details

  • Location: Faribault & Chaska, MN
  • Completion Date: 2019

NCC Performed:

  • National Conductor Maintenance & Inspection Division performs Borescope inspections each year at both the Faribault Energy Center & the Minnesota River Station.
  • Every other year we normally also perform Cryogenic cleaning on their IPB at both sites as well.

Lakefield Junction

Project Details

  • Location: Trimont, MN
  • Completion Date: 2018

NCC Performed:

  • National Conductor has performed Borescope inspections, Cryogenic cleaning, silver plating, and for the last 4 years we have rebuilt their Non-Seg bus on each unit.
  • NCC will be completing Unit 5 & 6 in the fall of 2019.

Columbia Energy Center

Project Details

  • Location: Richland, Washington
  • Completion Date:

NCC Performed:

  • NCC performed Silver Plating onsite.

Pleasant Valley

Project Details

  • Location: Dexter, MN
  • Completion Date: 2018

NCC Performed:

  • National Conductor has performed Borescope Inspections, Cryogenic cleaning, silver plating, gasket replacement, bellow replacement, rain guard installation, and emergency calls for Pleasant Valley.

5 Year Work History

PLANT BARRY 7B
MCMEEKIN STATION
SILVER BAY
WASHINGTON COUNTY
MINNESOTA RIVER STATION
LUDINGTON PUMPED STATION
HINDS ENERGY CENTER
WATEREE STATION
PLANT BARRY 7A
MINNESOTA RIVER STATION
NEBRASKA CITY-CLEAN
CHANNELVIEW
ESSEX
LAKEFIELD JUNCTION
HINDS ENERGY
GERALD GENTLEMAN
MINNESOTA RIVER STATION
EB HARRIS
ELGIN ENERGY CENTER
MIDLAND COGENERATION
LAKEFIELD JUNCTION
PLEASANT VALLEY (12)
HINES ENERGY COMPLEX

PANDA SHERMAN
CHANNELVIEW
MCMEEKIN STATION (2)
PLANT BARRY 6B
FARIBAULT ENERGY PARY
GERALD GENTLEMAN STATION
OAK GROVE
MAGNET COVE
PLANT BARRY 6A
PLANT BARRY 5
NEBRASKA CITY-EMERGENCY
LAKEFIELD JUNCTION
PLANT WATSON
GREENLAND ENERGY
NEBRASKA CITY
DARBY POWER
PLANT BARRY 7A
LAKEFIELD JUNCTION
HINES ENERGY CENTER
LOWER MONUMENTAL
DOLET HILLS
MINNESOTA RIVER STATION
PLEASANT VALLEY (13)

ST. BONIFACIUS
NODAWAY
RW  MILLER
BLUEGRASS  STATION
ESSEX
SALUDA  HYDRO STATION
CHANNELVIEW
BLUEGRASS  STATION
WATEREE  STATION
SILVER  BAY
OAK  GROVE
PLEASANT  VALLEY UNIT 13
MAGNET  COVE
PLANT  THEODORE
SHERMAN  PANDA
FARIBAULT
PLANT  THEODORE
DOGWOOD  ENERGY
RUMFORD  ENERGY CENTER
CRYSTAL  RIVER
HINES  ENERGY COMPLEX
FARIBAULT  ENERGY PARK
GERALD  GENTLEMAN