138kV Substation
Substation construction and concrete foundation installation
Project Type:
Renewable Energy
Completion Date
November, 2023
Project Scope
The substation construction consisted of adding 14" granular fill to prepare subgrade, installing
concrete foundations, below grade conduit and grounding, installing steel structures, insulators, bus,
above grade conduit and grounding, installation of 138kV and 35kV circuit breakers, switches, metering
units, instrument transformers, arresters, pulling and terminating control & power cable and then installation
of final rock surfacing and security fence.